Frame 7EA Buckets
Available from PW Power Systems, Inc.
PW Power Systems (PWPS) offers 1st, 2nd, and 3rd stage buckets for use in Frame 7EA gas turbines. The PWPS designed buckets offer enhanced durability and extended part life at a competitive price.
The Frame 7EA buckets are manufactured from a nickel based proprietary alloy that greatly enhances the life of the part. Parts are coated with proprietary coatings that provide superior oxidation resistance and enhanced life capability through improvements in part design and material upgrades. High-temperature performance up to 2055 °F is achieved with the application of world-class metallic-bond coating and thermal barrier coating (TBC).