FT8® MOBILEPAC® Gas Turbine Package

Available from PW Power Systems, Inc.

30 MW of power

The FT8® MOBILEPAC® gas turbine package requires a small footprint, utilizing a 72 by 53 foot area*. Very little advanced site preparation is required, and no foundation or concrete pad is necessary for installation of the unit. The unit is transportable by land, sea or air, allowing worldwide delivery of the MOBILEPAC® gas turbine package within 24 hours.
*Compact footprint installed in parallel or in-line. This footprint allows equipment access and necessary clearance.

The MOBILEPAC® gas turbine package design includes two trailers. The first trailer contains the gas turbine, electric generator, exhaust collector, diffuser, and engine lube oil system. The second trailer carries the 15 kilovolts switchgear, control system, operation panel, protective relays, batteries and charger, motor control center, and the hydraulic start package. A pre-commissioned MOBILEPAC® gas turbine package can be driven to a site and begin generating power
in less than one day.

Rate and Review PW Power Systems, Inc.

Rating: 0 - 0 reviews
Let users know what you would have wanted to know about this company.
Click on a star to rate this company
Post anonymously
When writing a review, please adhere to the Review Guidelines.